Kitchen and Bathroom Refurb

Job Summary:

Client had a new boiler/cylinder system installed, Old kitchen, flooring and walls removed, New kitchen, flooring installed, Kitchen plastered to finish. Old bathroom ripped out then split into two with new suites, flooring and tiling in both.

Star Photos;

Before:

During:

After: